Project Overview

Professional Systems Engineering’s talented staff have years of experience in BHMA hardware, ASTM Grade 1 openings, electric solenoid, electro-mechanical half cycle and full cycle locks, pneumatic sliders, high security locks, and UL Listed attack hardened detention hardware. The diversity of physical security assignments have included automated anti‑ballistic revolving openings, optical and physical turnstiles, fire/smoke-rated openings, K-rated sallyports, inertial vehicle barrier systems, “SCIF” enclosures, anti-terrorism protection, and physical fencing and attack-rated barriers/assemblies.

Our staff is skilled in all aspects of openings, especially meeting strict fire code requirements and the highest security protected portals. Our experience includes large pneumatic door/lock projects, complete hardware specifications, “SETS” documentation, and critical site commissioning and testing to rigid “anti-terrorism, hardened inmate, and gang” standards of practice.

Project Examples of openings, locking, and physical security consulting

  • The $135 million Saint Elizabeths Hospital in Washington, DC required detention locking, egress keying, master keying systems, and key control. Full documentation, user program, training, and commissioning included high security fencing, sallyports, and gate controls.
  • The $431 million SCI Graterford East and West near Philadelphia required detention and openings consulting including attack resistance, physical security barrier specifications/narratives, detention locks/doors/gates/sliders, and complete maximum security fencing, sallyports, and K-rated barriers.
  • The $45 million Niagara Falls Police and Courts Facility included detention locks, openings, construction administration, and closeout.
  • The State of New Jersey Bayside State Prison’s $2 million detention openings renovation occurred while fully occupied replaced old openings with new pneumatic sliders, cell locks, and related hardware and controls.
  • Philadelphia Industrial Corrections Complexes 10-year pod‑by‑pod renovation included significant lock and detention openings upgrades to meet stricter security goals while automating all operable doors/gates to meet the highest standards.
  • San Francisco’s $135 million Jail #3 required PSE to provide substantial documentation and commission the locking systems, openings, detention frames, hollow metal and related locks, and controls.
  • The $75 million Clay Center for the Arts and Science in West Virginia required all our specified hardware and openings with electronic control.