Project Overview

Professional Systems Engineering, LLC provided design/consulting services for enhanced digital courtroom technology. The Bankruptcy Court renovation project included technology renovation of an existing court space at the existing courthouse building.

PSE provided survey, infrastructure analysis, cabling upgrades, speaker and microphone upgrades, and full video and projector improvements.

Due to the existing noise floor and challenging acoustics of this historic space, PSE carefully administered corrective measures during final adjustments to bring the space within acceptable acoustical parameters required by the court. The courtroom includes the infrastructure and equipment required to support advanced features such as video annotation, video conferencing, and teleconferencing.

The courtroom includes the infrastructure and equipment required to support advanced features such as video annotation, video conferencing, and teleconferencing.

Courtroom Technology

  • Video display for each courtroom position
  • Evidence presentation systems
  • Video annotation system
  • Court reporting system integration
  • Courtroom audio recording system
  • Video conferencing and teleconferencing
  • Touchscreen A/V control system
  • Acoustical analysis
  • Digital matrix audio mixing system
  • Bench conference noise masking system
  • Assisted Listening systems for Americans with Disabilities Act (ADA)