Phone: 800.839.5060
9-1-1/EOC Centers
Amtrak 9-1-1
City of Elizabeth
County of DE, PA
Hudson Police/Fire
South Brunswick

Cultural Centers
Corporate/Professional
Fiserv Trust
Wyndham Hotel

Correctional/Justice
Alameda JDC
Bridgeport Courts
County of Delaware
Crossroads/Horizon
Franklin Courthouse
Hartford JDC
Kent Courthouse
Lehigh Courthouse
Lex-Fay-Security/Fire
Lex-Fay-Telecom
Niagara Falls
SCI Graterford
Travis Jail
Washington County Courthouse
Educational
Science Park HS-Data
Science Park HS-Security
Roberto Clemente
Energy
Citgo-Refinery
Citgo-Lake Charles 1
Citgo-Lake Charles 2
Citgo-N. American
Donald C. Cook NPP
Clark Energy Cntr.
Hospitals
Perkins Hospital
St. Elizabeths

Specialized Lighting
Allegheny Tunnel
Transportation
Amtrak 8th Street
Homeland Security
PHL Fire Gates
PHL Security

Project Profile: NY State Hydro Power Dams and Clark Energy Center, Massena, NY

Project: Switchyard, Control Center and Intake Security Study, and Design

Client: New York State Power Authority

Scope of Work: Professional Systems Engineering, LLC conducted a security study and implemented counter terrorist security deterrents for two dams, the 345kV/765kV high tension distribution Massena switchyard, and the water supply intake for the town of Massena, NY. A component of the study included cyber security for SCADA and telemetry systems.

The R.E. Moses Power Dam (FDR Power Project) is a critical power generation dam spanning the St. Lawrence River, and is shared with Canada. The Long Sault Dam is a critical water control dam on the St. Lawrence River, which is associated with the Moses Dam. The Massena switchyard is a critical feed to the NYPA electrical power distribution system. The study assessed the vulnerabilities of the facilities, documented the existing security measures, provided recommendations with alternatives, and provided a detailed construction cost estimate.

The Clark Energy Center is a major control center for electrical power distribution for NYPA and is manned 24 hours per day. The 345kV switchyard is a critical feed to the NYPA electrical power distribution system. The study assessed the vulnerabilities of the facilities, documented the existing security measures, provided alternatives and recommendations, and provided a detailed construction cost estimate. The CEC system will interface with the existing NYPA system-wide security control center located approximately 125 miles away, which will have remote control and monitoring capabilities of the CEC system.

Our consulting and specifications included:

  • Perimeter barriers
  • Intrusion detection
  • Digital CCTV cameras
  • Digital CCTV switching and recording
  • Security lighting
  • Interfacing with existing security power supplies
  • Computer systems
  • Security control center
  • Cyber security analysis
NY State Hydro Power Dams and Clark Energy Center, Massena, NY
Switchyard, Control Center and Intake Security Study, and Design