| Project Profile: Lexington-Fayette County Detention Center, Lexington, KY
Project: Communications and Advanced Systems Consulting
Scope of Work: Professional Systems Engineering provided systems design and consulting services for control, communications, and infrastructure.
A $60 million facility, built in 18 months, required an entire universal wiring infrastructure. A complete RFP for communications was prepared for the equipment budget of $1.6 million and infrastructure costs of over $400,000.
This 400,000 sq. ft. facility encompasses multiple county/city jurisdictions in the Lexington, Kentucky area. Because the design/build contracts awarded approached a cost of $60 million, the owner and planners obtained expert fire, tele/data communications, audio, multimedia, and video consulting provided by PSE. The project was lauded as a complete success.
|
Communications
- High speed network design
- Master control center design
- Satellite TVRO facilities
- Data telecommunications design
- Computer architecture design
- Digital TV studio/ broadcast design
- Large bandwidth digital data/telecom/video/WAN design for integration to County Government
- Data/telecom/video RFP preparation valued at $2.3 million
|
Systems
- Twenty-four video conference stations with ISDN, H.323 and SONET ring capabilities to city courts
- Advanced tele/data/video and information technologies facilitation and engineering using gigabit layer 3 switching
- Digital studio television and recording systems for site-wide distribution and training
|