Professional Systems Engineering, LLC
Consulting, Design, and EngineeringProfessional Systems Engineering, LLCProfessional Systems Engineering, LLCProfessional Systems Engineering, LLCProfessional Systems Engineering, LLCProfessional Systems Engineering, LLCProfessional Systems Engineering, LLCProfessional Systems Engineering, LLC
Professional Systems Engineering, LLCProfessional Systems Engineering, LLCProfessional Systems Engineering, LLCProfessional Systems Engineering, LLC
9-1-1/EOC Centers
Amtrak 9-1-1
City of Elizabeth
County of DE, PA
Hudson Police/Fire
South Brunswick

Cultural Centers
Corporate/Professional
Fiserv Trust
Wyndham Hotel

Correctional/Justice
Alameda JDC
Perkins Hospital
County of Delaware
Crossroads/Horizon
Hartford JDC
Kent Courthouse
Lehigh Courthouse
Niagara Falls
Educational
Newark Science Park
Roberto Clemente
Energy
Citgo-Refinery
Citgo-Lake Charles
Citgo-MFG
Citgo-N. American
Donald C. Cook NPP
Clark Energy Cntr.
Specialized Lighting
Allegheny Tunnel
Transportation
Amtrak 8th Street
Homeland Security
Fire Training Gates

Project Profile: Donald C. Cook Nuclear Power Station
Bridgman, MI

Project: Security Threat Assessment and Critical Infrastructure

Scope of Work: Professional Systems Engineering, LLC performed threat assessment and risk mitigation studies, developed a conceptual design to upgrade the perimeter security systems, and procedures for the Donald C. Cook Nuclear Power Station. The plant has the capacity to produce 1020 megawatts through the pressurized water reactors. The project included a site assessment and preparation of a report and conceptual design. Recommendations were made to modify protected area barriers, establish bullet-resistant defensive positions, replace the soil for stabilization, intrusion detection system upgrades, CCTV system, and upgrade the lighting. PSE also prepared a detailed cost estimate.

Under a tight timetable established by the Nuclear Regulatory Commission (NRC), PSE adapted a 20-year-old nuclear security infrastructure to accommodate new technologies. This enhancement, in response to recent terrorist threats and attacks, established a higher level of ability to neutralize many threats perceived by the plant operators and security staff.

PSE developed a conceptual design to upgrade the vital area security system. The design included enhancement of vital area barriers, addition and replacement of CCTV surveillance equipment, and enhancement of the interior intrusion detection system. The design also included new conduit and cable, seismic supports, and interface to the existing security system and the existing CAS and SAS consoles.

Donald C. Cook Nuclear Power Station, Bridgman, MI
Threat Assessment and Concepts
  • Protected area barrier design
  • New defensive position recommendations
  • Vital area barrier design
  • Upgrades to central and secondary alarm system consoles

Critical Enhancements
  • New CCTV surveillance systems
  • Perimeter intrusion detection systems (PIDS) enhancement
  • New critical infrastructure
  • New entrance gate barriers and controls