Professional Systems Engineering, LLC
Consulting, Design, and EngineeringProfessional Systems Engineering, LLCProfessional Systems Engineering, LLCProfessional Systems Engineering, LLCProfessional Systems Engineering, LLCProfessional Systems Engineering, LLCProfessional Systems Engineering, LLCProfessional Systems Engineering, LLC
SecurityProfessional Systems Engineering, LLCProfessional Systems Engineering, LLCProfessional Systems Engineering, LLCProfessional Systems Engineering, LLC
9-1-1/EOC Centers
Amtrak 9-1-1
City of Elizabeth
County of DE, PA
Hudson Police/Fire
South Brunswick

Cultural Centers
Corporate/Professional
Fiserv Trust
Wyndham Hotel

Correctional/Justice
Alameda JDC
County of Delaware
Crossroads/Horizon
Hartford JDC
Kent Courthouse
Lehigh Courthouse
Lex-Fay-Security/Fire
Lex-Fay-Telecom
Niagara Falls
Educational
Newark Science Park
Roberto Clemente
Energy
Citgo-Refinery
Citgo-Lake Charles
Citgo-MFG
Citgo-N. American
Donald C. Cook NPP
Clark Energy Cntr.
Hospitals
Perkins Hospital
St. Elizabeths

Specialized Lighting
Allegheny Tunnel
Transportation
Amtrak 8th Street
Homeland Security
Fire Training Gates

Project Profile: Philadelphia Video Arraignment
Philadelphia, PA

Project: Informations Systems Assessment and Procurement Administration

Client:
The City of Philadelphia

Construction Cost: $1 Million

Scope of Work:
Professional Systems Engineering, LLC provided consulting engineering services for the design, RFP documentation and construction administration of a new H.320/H.323 compliant video arraignment/interview network. This system replaced an existing obsolete system. The system administration is in the Criminal Justice Center. Terminals are located in each police district, CFCF, City Hall, CJC and the Round House.

Designed Video Arraignment Terminal Units that consisted of codec units, 27” color monitors, 30 frames/second color video camera, audio handset with an auto-dialed telephone mounted in a hardened, secured enclosure. These units were installed in the police precincts throughout the City.

Designed Pre-Trial Units with 27” color monitors, 20 frames/second color video cameras, and microphones in hardened enclosures located in the traffic courts throughout the city.

Designed desktop Pre-Trial Interview Terminal Units consisting of computer, video card, SVGA color monitor, 30 frames/second cameras, and audio channel with handset. These units were located in the Public Defenders office.

Designed the Arraignment Courtroom Terminal Units at the Criminal Justice Center’s main Courthouse’s general and back-up courtrooms. These units consisted of computers, video cards, two 32” color monitors, SVGA monitors, three pan-tilt-zoom (PTZ) color cameras with remote control system, microphones, push-to-talk intercom, telephones with auto-dial.

Designed System Administration Computer systems to contact and control the various sites with on screen site switching through Graphical User Interface (GUI) software. One administrative computer system was located at CJC main courthouse, and the other at the public defenders office building.
|
Design Included:

  • ISDN, T1, PSTN
  • Bell Network Manager & DACS
  • Video Arraignment Cabinets,
    Desktops & Courtroom Terminals
  • Audio and Video Systems
  • H.320/H.323 Compliant CODECS
  • UPS Power for each arraignment, interview, and courtroom system
  • 33 Stations at 15 Sites
  • System Administration
  • Demolition of Existing
  • Ethernet Network Running
    TCP/IP Protocol
  • Pre-Trial Defendant Terminal
  • Courtroom Arraignment Terminals
  • Defendant Arraignment Terminals