Project Profile: Callaway Nuclear Power Plant
Fulton, MO
Project: Security Threat Assessment and Critical Infrastructure
Client: AmerenUE
Construction Cost (Estimated): $2.6 million
Scope of Work: As part of the steam generator replacement project, Professional Systems Engineering, LLC prepared detailed designs for the expansion of the existing Callaway Nuclear Generator Station. The 1235 megawatt pressurized water required enhancements to secure the perimeter. The design include development of all construction documents including fence and barrier location drawings, equipment location drawings, system block diagrams, interconnection wiring diagrams, CCTV design, equipment mounting details, conduit and cable lists, bills of material, purchase requisitions, plant modification package, and acceptance test procedures. The design included perimeter barriers, perimeter duct bank, perimeter intrusion detection, CCTV cameras, and towers, high mast lighting, and interfacing with the existing security system power supplies, computer system, alarm stations, multiplexers, and CCTV switching and control system.
|
Nuclear Regulatory Compliance
-
- Design document status report (DDSR)
- Re-licensing input
- Plant modification package (PMP)
- Acceptance test procedures
- Personnel access, nuisance delay and vehicle barriers
|
Security Improvements
- Fencing and barrier designs
- Perimeter duct banks
- Intrusion detection (PIDS)
- CCTV surveillance
- High mast lighting
- Block diagrams, mounting details, conduit/cable lists, bills of materials, and purchase requisitions
|