Professional Systems Engineering, LLC
Consulting, Design, and EngineeringProfessional Systems Engineering, LLCProfessional Systems Engineering, LLCProfessional Systems Engineering, LLCProfessional Systems Engineering, LLCProfessional Systems Engineering, LLCProfessional Systems Engineering, LLCProfessional Systems Engineering, LLC
SecurityProfessional Systems Engineering, LLCProfessional Systems Engineering, LLCProfessional Systems Engineering, LLCProfessional Systems Engineering, LLC
9-1-1/EOC Centers
Amtrak 9-1-1
City of Elizabeth
County of DE, PA
Hudson Police/Fire
South Brunswick

Cultural Centers
Corporate/Professional
Fiserv Trust
Wyndham Hotel

Correctional/Justice
Alameda JDC
County of Delaware
Crossroads/Horizon
Hartford JDC
Kent Courthouse
Lehigh Courthouse
Lex-Fay-Security/Fire
Lex-Fay-Telecom
Niagara Falls
Educational
Newark Science Park
Roberto Clemente
Energy
Citgo-Refinery
Citgo-Lake Charles
Citgo-MFG
Citgo-N. American
Donald C. Cook NPP
Clark Energy Cntr.
Hospitals
Perkins Hospital
St. Elizabeths

Specialized Lighting
Allegheny Tunnel
Transportation
Amtrak 8th Street
Homeland Security
Fire Training Gates

Project Profile: Callaway Nuclear Power Plant
Fulton, MO

Project: Security Threat Assessment and Critical Infrastructure

Client: AmerenUE

Construction Cost (Estimated): $2.6 million

Scope of Work:
As part of the steam generator replacement project, Professional Systems Engineering, LLC prepared detailed designs for the expansion of the existing Callaway Nuclear Generator Station. The 1235 megawatt pressurized water required enhancements to secure the perimeter. The design include development of all construction documents including fence and barrier location drawings, equipment location drawings, system block diagrams, interconnection wiring diagrams, CCTV design, equipment mounting details, conduit and cable lists, bills of material, purchase requisitions, plant modification package, and acceptance test procedures. The design included perimeter barriers, perimeter duct bank, perimeter intrusion detection, CCTV cameras, and towers, high mast lighting, and interfacing with the existing security system power supplies, computer system, alarm stations, multiplexers, and CCTV switching and control system.

Nuclear Regulatory Compliance
  • Design document status report (DDSR)
  • Re-licensing input
  • Plant modification package (PMP)
  • Acceptance test procedures
  • Personnel access, nuisance delay and vehicle barriers

Security Improvements

  • Fencing and barrier designs
  • Perimeter duct banks
  • Intrusion detection (PIDS)
  • CCTV surveillance
  • High mast lighting
  • Block diagrams, mounting details, conduit/cable lists, bills of materials, and purchase requisitions

Security Design
Nuclear Security